Monday, October 4, 2010

....more construction

Saturday was very productive. We actually took the kitchen from a major construction area back to where it is actually usable as a kitchen and the living room is cleared of all clutter and is usable as a living room. Nice!

Cabinet doors and drawers back from paint, installed and knobs/handles installed:
Starting in with the "gold" paint:


Dad gettin' jiggy with the plumbing on the new kitchen faucet:

Starting to look like the final vision; granite, painted cabinets, gold paint (still needs the tile backsplash started)
New sink is in, new tile backspash started and new faucet installed:

Mom appears to be somewhat excited to be to the point where she was able to start painting (the ceiling) on Saturday night. Also note that the refrigerator is back where it belongs and that also is something to be very happy about:
Skip forward to today and dad is putting all the backsplash tiles in place: